BC Hydro - Network Control Centre


BC Hydro is one of the largest electric utilities in Canada, providing high-value, reliable power to fuel economic growth in British Columbia. BC

Hydro’s primary business activities are the generation and
distribution of electricity and their control centre in Vancouver monitors the transmission lines.

Applied Electronics was contracted to design and integrate a rear projection system composed of a wall structure housing six 100” (diagonal) display screens, mirror system and high performance DLP projectors. The new monitor wall replaced an existing static mimic analog board which was removed entirely and the wall on which it was affixed taken down in order to construct a brand new wall that would meet the design and space requirements of the new display system.

Great care was taken to ensure that the new monitor wall was integrated seamlessly; hence a custom metal stand assembly was fabricated to house the projectors, mirrors and screens in order to solve the space limitation problem.

Share This!

See More

Energy and Mining Projects
TwitterFeed
  • Applied and Sharp will be at the MISA BC Conference from Sept 10-13 in Kelowna - Booth no 10. Come and check out the @Sharp_Lcd Aquos Display Monitor in action! Posted: 52 Days ago
  • Getting an in-depth demo of the with @RED_Cinema Squad Sergeant, Andrew! Posted: 58 Days ago
  • by our very own @RED_Cinema Squad Sergeant, Andrew Aniceto! Posted: 58 Days ago
  • Toronto's cinematographers checking out the latest lineup coming from @RED_Cinema Posted: 58 Days ago
  • Toronto RED Users getting their hands on the new & cameras at our @RED_Cinema sync-up! Posted: 58 Days ago
  • If you're going to @siggraph next week in Vancouver, don't forget to visit our friends @Avid to get some info and a demo of their MediaCentral | Cloud UX tool. They'll be at the @Microsoft booth (#620)! Posted: 70 Days ago
© 2012 - 2018 Applied Electronics Limited. All Rights Reserved.